A single-story home addition in McKinney usually costs $250 to $450 per square foot, so a 400 square foot addition often runs $100,000 to $180,000. A second-story addition usually costs $300 to $500 per square foot because of the extra structural work. The foundation, the roof tie-in and your finishes decide where you land.
2026 budget guidance for McKinney and North Texas, not a quote. Your exact price comes in a written bid after we visit your property.
Addition, Allen
Second Story, Nevada
Addition, PrincetonThese examples multiply our 2026 per square foot ranges by common addition sizes. Lower numbers fit simpler rooms with standard finishes. Higher numbers fit kitchens, bathrooms, vaulted ceilings and upgraded finishes. See real projects on our home additions page.
| Addition size | Typical use | 2026 budget range |
|---|---|---|
| 200 sq ft | Office, nursery or a bigger living area | $50,000 to $90,000 |
| 400 sq ft | Bedroom with a bathroom, or a large family room | $100,000 to $180,000 |
| 600 sq ft | Primary suite with a bath and closet | $150,000 to $270,000 |
| 800 sq ft | Primary suite plus a second room | $200,000 to $360,000 |
| Addition size | Typical use | 2026 budget range |
|---|---|---|
| 400 sq ft | Bedroom with a bathroom over the garage or main floor | $120,000 to $200,000 |
| 600 sq ft | Two bedrooms or a game room with a bath | $180,000 to $300,000 |
| 800 sq ft | A full second-floor suite | $240,000 to $400,000 |
| 1,000 sq ft | Several rooms and a bathroom | $300,000 to $500,000 |
Based on $250 to $450 per square foot for single-story additions and $300 to $500 per square foot for second-story additions. Ranges are 2026 budget guidance for McKinney and North Texas, not a quote.
These ranges are general 2026 budget guidance for North Texas, not a quote, bid or offer. Your price depends on your site, design, selections and permits, and is only set in a written, signed EXL agreement after a site visit.
Every addition has to be built new and then joined to a house that is already there. These are the parts that change the price the most.
A ground-floor addition needs a new foundation built for North Texas soil. A second story needs the existing walls and foundation checked and often reinforced, which is why it costs more per square foot.
Joining the new roof to your existing roofline is one of the trickiest and most important parts of the job. Complex rooflines take more framing, flashing and roofing to keep water out and look original.
Rooms with plumbing cost more than bedrooms or living space. A new bathroom adds tile, fixtures, plumbing lines and venting.
Your addition needs wiring, lighting and heating and cooling. Sometimes the existing system can be extended, and sometimes the addition needs its own unit.
Additions in McKinney need a building permit, and most need engineered plans. Many HOAs also review exterior changes. Permit and engineering costs are listed in an EXL bid.
Matching your existing brick, roofing, windows and flooring so the addition looks like it was always there takes time and care. Higher-end finishes move you toward the top of the range.
Here is what the City of McKinney publishes about residential additions. EXL handles the drawings, the permit and the inspections.
The City of McKinney's Residential Addition and Alteration Guide quotes the city ordinance that you need a permit to add to or structurally alter any building in the city. In plain terms, every home addition needs a building permit.
The same guide says anything physically attached to the main house has to meet the same setbacks as the house, and that engineered framing plans are required when they apply to the project. We check your setbacks and plan the engineering before we design.
McKinney adopted the 2024 International Residential Code on October 1, 2025, according to McKinney Building Inspections. Your addition is inspected at each stage, and homes in the Historic District also need a Certificate of Appropriateness for exterior work.
Most McKinney HOAs require approval for additions because they change the outside of the home. We give you the 3D design and drawings to submit and wait for approval before we break ground.
Most additions take 4 to 6 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.
We walk your home, measure and design the addition in 3D so you can see the layout and the outside before anything is built.
We prepare the drawings and engineering, submit to your HOA and the city, and answer any review comments.
Foundation, framing, roof tie-in, mechanical work, insulation, drywall and finishes, with city inspections along the way.
The city signs off and we walk the finished addition with you before we call it done.
Here is how pricing works with EXL, from the first visit to a written number you can plan around.
RJ comes out, walks your property with you and listens to what you want. We measure, take photos and talk honestly about budget. There is no charge for the visit.
We design your addition in 3D so you can see the layout, the finishes and how it fits your home before anything is built. You approve the design first.
You get a detailed written price that lists what is included, the selections and allowances, optional upgrades and what is not included. Permits and engineering are listed in the bid.
During the build you get a private CompanyCam link with daily job photos, so you can watch your addition go up from your phone. EXL is rated 5.0 on Google. Call (855) 225-3395 to set up your visit.
Quick answers to what McKinney homeowners ask us most. Have another one? See all of our homeowner questions.
A single-story home addition in McKinney usually costs about $250 to $450 per square foot. A second-story addition usually costs $300 to $500 per square foot because of the structural work. These are 2026 budget ranges, and your exact price comes in a written bid.
A 400 square foot single-story addition in McKinney usually costs about $100,000 to $180,000. As a second story, the same 400 square feet usually runs about $120,000 to $200,000. Bathrooms, kitchens and high-end finishes push it toward the top of the range.
Per square foot, usually yes. A second story costs about $300 to $500 per square foot compared to $250 to $450 for a single-story addition, because the existing structure has to carry the new floor. It can still make sense when your lot or setbacks leave no room to build out.
Yes. The City of McKinney requires a building permit to add to or structurally alter a home, and most additions also need engineered plans. EXL prepares the drawings, pulls the permit and meets the inspectors.
Most home additions take 4 to 6 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.
Most McKinney HOAs require approval for an addition because it changes the outside of your home. EXL gives you the 3D design and drawings to submit, and we wait for approval before we start.
About these numbers. Price ranges on this page are based on current 2026 North Texas market pricing for the kinds of projects EXL builds, and the size examples multiply those per square foot ranges. They are 2026 budget planning ranges, not a quote or a bid, and every EXL project is priced in writing after a site visit. City rules noted on this page come from the City of McKinney website and can change, so we confirm them for your address before we design. Last reviewed November 2026.
Tell us what kind of space you need. RJ will walk your home with you, design the addition in 3D and send you a detailed written bid.
Tell us about your home and what you have in mind. We will set up a walkthrough and give you a clear, written estimate.
Takes about two minutes. Someone from our team will reach out to set up a walkthrough.