A detached ADU or mother-in-law suite in McKinney starts at about $200 per square foot, and the price goes up from there. Most land between $200,000 and $400,000 or more. That price is for a real small home with its own kitchen, bathroom, HVAC and utilities. Every project is different, so size, finishes, site conditions and how difficult the build is decide where you land.
2026 budget guidance for McKinney and North Texas, not a quote. Your exact price comes in a written bid after we visit your property.
Backyard ADU, Allen
Brick ADU, Rowlett
Guest House, CelinaThese examples show starting prices at about $200 per square foot for common ADU sizes. The price goes up from there with finishes, site conditions and how difficult the build is. Most detached ADUs and mother-in-law suites in North Texas land between $200,000 and $400,000 or more. See real projects on our ADUs and guest houses page.
| ADU size | Typical layout | 2026 starting price |
|---|---|---|
| 800 sq ft | One bedroom suite with a kitchen, bath and living area | From $160,000 |
| 1,000 sq ft | One or two bedrooms with a full kitchen and bath | From $200,000 |
| 1,200 sq ft | Two bedrooms, a full kitchen and a larger living area | From $240,000 |
Based on a starting point of about $200 per square foot, with most detached ADUs landing at $200,000 to $400,000 or more. In McKinney, ADU size is also limited by the size of your main home, so check the city rules below. Ranges are 2026 budget guidance, not a quote.
These ranges are general 2026 budget guidance for North Texas, not a quote, bid or offer. Your price depends on your site, design, selections and permits, and is only set in a written, signed EXL agreement after a site visit.
An ADU is a complete small home, so it has almost every cost a full house has. These are the things that change the price the most.
More square feet means more of everything. A second bedroom or a bigger kitchen adds cost, but the per square foot price can drop a little as the home gets bigger because the kitchen, bath and HVAC are already counted.
Water, sewer, electric and sometimes gas have to run from your main house to the ADU. A long run, a tight backyard or trees in the way add trenching and labor.
A detached ADU needs its own foundation built for North Texas soil and its own roof. Matching the roof style and pitch of your main house is common and often required by HOAs.
Cabinets, counters, tile, appliances and flooring move the price more than anything else inside. Mid-range and high-end finishes can be a big part of the difference between the low and high ends.
McKinney requires framing plans for every ADU and a full building permit. Many HOAs add their own rules. Permit and engineering costs are listed in an EXL bid.
Brick, stone or siding that matches your main home costs more than basic siding, but it makes the ADU feel like it belongs on the property and can help with HOA approval.
McKinney allows ADUs on many single-family lots. Here is what the city publishes, in plain language. We confirm the rules for your exact address before we design.
According to the City of McKinney's ADU page and FAQ, you can build an ADU if your property is zoned for a single-family home and has enough room to meet the building rules. Special zoning such as some Planned Development districts may not allow one, and the city notes your HOA may have extra rules.
The city's ADU FAQ says an ADU must be smaller than your main home. If your home is 1,200 square feet or more, the ADU can be up to 50 percent of its size. For smaller homes it can be up to 75 percent. The ADU cannot be taller than your house and follows the same setbacks as your home.
The city also says an ADU shares the main home's utility meters, with no separate electric meter, and that you may need to add a parking space if you have fewer than four. The Residential Addition and Alteration Guide requires framing plans for every ADU and limits each lot to one ADU.
Most McKinney HOAs review ADUs and other exterior projects, and some limit them. Before we design anything, EXL checks your zoning, your lot and your HOA rules so you know what you can build.
Most detached ADUs take 5 to 8 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.
We check your zoning, lot and HOA rules, then design your ADU in 3D so you can see the layout and how it sits on the lot.
We prepare the plans and engineering, submit to your HOA and the city, and answer any review comments.
Utilities, foundation, framing, roofing, mechanical work, insulation, drywall and finishes, with city inspections along the way.
The city signs off and we walk the finished ADU with you, ready to move in.
Here is how pricing works with EXL, from the first visit to a written number you can plan around.
RJ comes out, walks your property with you and listens to what you want. We measure, take photos and talk honestly about budget. There is no charge for the visit.
We design your ADU in 3D so you can see the layout, the finishes and how it fits your home before anything is built. You approve the design first.
You get a detailed written price that lists what is included, the selections and allowances, optional upgrades and what is not included. Permits and engineering are listed in the bid.
During the build you get a private CompanyCam link with daily job photos. EXL has built ADUs and guest houses across North Texas and is rated 5.0 on Google. Call (855) 225-3395 to set up your visit.
Quick answers to what McKinney homeowners ask us most. Have another one? See all of our homeowner questions.
A detached ADU or mother-in-law suite in McKinney starts at about $200 per square foot and goes up from there, and most land between $200,000 and $400,000 or more. Every project is different, so size, finishes, site conditions and difficulty decide the final price. These are 2026 budget ranges, and your exact price comes in a written bid after a site visit.
In many cases, yes. The City of McKinney allows ADUs on lots zoned for single-family homes that have enough room to meet the building rules. Some Planned Development districts and HOAs may not allow them, so EXL checks your zoning, lot and HOA rules before we design.
According to the City of McKinney, an ADU can be up to 50 percent of the size of your main home if the home is 1,200 square feet or more, or up to 75 percent for smaller homes. It also cannot be taller than your main home.
No. The City of McKinney says an ADU shares the utility meters of the main home and cannot have a separate electric meter. We plan the utility runs from your main house as part of the design.
Most detached ADUs take 5 to 8 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.
An EXL ADU price covers a complete small home, including the foundation, framing, roof, kitchen, bathroom, HVAC, utilities and finishes, plus permits and engineering. Your written bid lists what is included, the allowances, optional upgrades and what is not included.
About these numbers. Price ranges on this page are based on current 2026 North Texas market pricing for the kinds of projects EXL builds, and the size examples use the starting price per square foot. They are 2026 budget planning ranges, not a quote or a bid, and every EXL project is priced in writing after a site visit. City rules noted on this page come from the City of McKinney website and can change, so we confirm them for your address before we design. Last reviewed November 2026.
Send us your address and what you have in mind. RJ will check your lot, walk it with you, design the ADU in 3D and send you a detailed written bid.
Tell us about your home and what you have in mind. We will set up a walkthrough and give you a clear, written estimate.
Takes about two minutes. Someone from our team will reach out to set up a walkthrough.