How Much Does an ADU Cost in McKinney, TX? (2026 Guide)

A detached ADU or mother-in-law suite in McKinney starts at about $200 per square foot, and the price goes up from there. Most land between $200,000 and $400,000 or more. That price is for a real small home with its own kitchen, bathroom, HVAC and utilities. Every project is different, so size, finishes, site conditions and how difficult the build is decide where you land.

2026 budget guidance for McKinney and North Texas, not a quote. Your exact price comes in a written bid after we visit your property.

Backyard ADU with a full kitchen built by EXL in Allen, TXBackyard ADU, Allen
Brick ADU built by EXL in Rowlett, TXBrick ADU, Rowlett
Brick guest house built by EXL in Celina, TXGuest House, Celina
2026 Prices

ADU prices by size.

These examples show starting prices at about $200 per square foot for common ADU sizes. The price goes up from there with finishes, site conditions and how difficult the build is. Most detached ADUs and mother-in-law suites in North Texas land between $200,000 and $400,000 or more. See real projects on our ADUs and guest houses page.

Detached ADU Cost by Size, 2026
ADU sizeTypical layout2026 starting price
800 sq ftOne bedroom suite with a kitchen, bath and living areaFrom $160,000
1,000 sq ftOne or two bedrooms with a full kitchen and bathFrom $200,000
1,200 sq ftTwo bedrooms, a full kitchen and a larger living areaFrom $240,000

Based on a starting point of about $200 per square foot, with most detached ADUs landing at $200,000 to $400,000 or more. In McKinney, ADU size is also limited by the size of your main home, so check the city rules below. Ranges are 2026 budget guidance, not a quote.

These ranges are general 2026 budget guidance for North Texas, not a quote, bid or offer. Your price depends on your site, design, selections and permits, and is only set in a written, signed EXL agreement after a site visit.

What Drives Cost

What moves the price.

An ADU is a complete small home, so it has almost every cost a full house has. These are the things that change the price the most.

Size and layout

More square feet means more of everything. A second bedroom or a bigger kitchen adds cost, but the per square foot price can drop a little as the home gets bigger because the kitchen, bath and HVAC are already counted.

Utilities and site work

Water, sewer, electric and sometimes gas have to run from your main house to the ADU. A long run, a tight backyard or trees in the way add trenching and labor.

Foundation and roof

A detached ADU needs its own foundation built for North Texas soil and its own roof. Matching the roof style and pitch of your main house is common and often required by HOAs.

Kitchen, bath and finishes

Cabinets, counters, tile, appliances and flooring move the price more than anything else inside. Mid-range and high-end finishes can be a big part of the difference between the low and high ends.

Permits, HOA and engineering

McKinney requires framing plans for every ADU and a full building permit. Many HOAs add their own rules. Permit and engineering costs are listed in an EXL bid.

Exterior materials

Brick, stone or siding that matches your main home costs more than basic siding, but it makes the ADU feel like it belongs on the property and can help with HOA approval.

Permits and HOA

ADU rules in McKinney.

McKinney allows ADUs on many single-family lots. Here is what the city publishes, in plain language. We confirm the rules for your exact address before we design.

According to the City of McKinney's ADU page and FAQ, you can build an ADU if your property is zoned for a single-family home and has enough room to meet the building rules. Special zoning such as some Planned Development districts may not allow one, and the city notes your HOA may have extra rules.

The city's ADU FAQ says an ADU must be smaller than your main home. If your home is 1,200 square feet or more, the ADU can be up to 50 percent of its size. For smaller homes it can be up to 75 percent. The ADU cannot be taller than your house and follows the same setbacks as your home.

The city also says an ADU shares the main home's utility meters, with no separate electric meter, and that you may need to add a parking space if you have fewer than four. The Residential Addition and Alteration Guide requires framing plans for every ADU and limits each lot to one ADU.

Most McKinney HOAs review ADUs and other exterior projects, and some limit them. Before we design anything, EXL checks your zoning, your lot and your HOA rules so you know what you can build.

Timeline

How long it takes.

Most detached ADUs take 5 to 8 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.

  1. Weeks 1 to 4

    Site visit, zoning check and 3D design

    We check your zoning, lot and HOA rules, then design your ADU in 3D so you can see the layout and how it sits on the lot.

  2. 1 to 3 months

    Engineering, HOA and permit

    We prepare the plans and engineering, submit to your HOA and the city, and answer any review comments.

  3. 5 to 8 months

    Construction

    Utilities, foundation, framing, roofing, mechanical work, insulation, drywall and finishes, with city inspections along the way.

  4. Final step

    Final inspection and walkthrough

    The city signs off and we walk the finished ADU with you, ready to move in.

How EXL Prices

How we get you a real number.

Here is how pricing works with EXL, from the first visit to a written number you can plan around.

01

Free site visit

RJ comes out, walks your property with you and listens to what you want. We measure, take photos and talk honestly about budget. There is no charge for the visit.

02

3D design

We design your ADU in 3D so you can see the layout, the finishes and how it fits your home before anything is built. You approve the design first.

03

Written bid

You get a detailed written price that lists what is included, the selections and allowances, optional upgrades and what is not included. Permits and engineering are listed in the bid.

During the build you get a private CompanyCam link with daily job photos. EXL has built ADUs and guest houses across North Texas and is rated 5.0 on Google. Call (855) 225-3395 to set up your visit.

FAQs

ADU FAQs.

Quick answers to what McKinney homeowners ask us most. Have another one? See all of our homeowner questions.

How much does an ADU cost in McKinney, TX?

A detached ADU or mother-in-law suite in McKinney starts at about $200 per square foot and goes up from there, and most land between $200,000 and $400,000 or more. Every project is different, so size, finishes, site conditions and difficulty decide the final price. These are 2026 budget ranges, and your exact price comes in a written bid after a site visit.

Can I build an ADU in McKinney?

In many cases, yes. The City of McKinney allows ADUs on lots zoned for single-family homes that have enough room to meet the building rules. Some Planned Development districts and HOAs may not allow them, so EXL checks your zoning, lot and HOA rules before we design.

How big can an ADU be in McKinney?

According to the City of McKinney, an ADU can be up to 50 percent of the size of your main home if the home is 1,200 square feet or more, or up to 75 percent for smaller homes. It also cannot be taller than your main home.

Can an ADU have its own electric meter in McKinney?

No. The City of McKinney says an ADU shares the utility meters of the main home and cannot have a separate electric meter. We plan the utility runs from your main house as part of the design.

How long does it take to build an ADU?

Most detached ADUs take 5 to 8 months of construction. Engineering, plans and permits usually add 1 to 3 months before we break ground.

What is included in an ADU price?

An EXL ADU price covers a complete small home, including the foundation, framing, roof, kitchen, bathroom, HVAC, utilities and finishes, plus permits and engineering. Your written bid lists what is included, the allowances, optional upgrades and what is not included.

About these numbers. Price ranges on this page are based on current 2026 North Texas market pricing for the kinds of projects EXL builds, and the size examples use the starting price per square foot. They are 2026 budget planning ranges, not a quote or a bid, and every EXL project is priced in writing after a site visit. City rules noted on this page come from the City of McKinney website and can change, so we confirm them for your address before we design. Last reviewed November 2026.